The OSTA TM company was officially accredited by the Ukroboronprom Group of Companies and was able to take part in the Prozorro site in a tender for the purchase of flooring materials in one of the production workshops of DAKhK Artem, which is part of the Ukroboronprom Group of Companies. Modular floors of TM “OSTA” came up to the cost and technical characteristics that were announced by the customer in the tender documentation.

Installation of OSTA ™ flooring was complicated by the fact that all the equipment was already mounted and was indoors. The work had to be carried out as soon as possible, in connection with this, the OSTA TM specialists provided several design solutions and it was decided to take the Spider reinforced module-plate as the basis for installation. The area of ​​the production building amounted to more than 1000 sq.m. Production time for modular plates is 10 days. The installation team of TM “OSTA” took 4 days to install the floor on such a large area of ​​the production room.

The customer was satisfied with the operational characteristics of the floor, the timing and execution of the installation, and noted that in comparison with the previous coating, the floor is much better to clean and resistant to stress.