The TM “OSTA” company, together with Siverteks (Chernihiv), takes part in departmental tests of the MOU Unit Module BM-30 for deploying hospitals for wounded soldiers of the Armed Forces in the open field. Sivertex supplies tents for medical purposes, we equip them with the modular floor of TM “OSTA”.

Due to the design of the locks on the slabs, the OSTA TM modular coating is mounted and dismantled very quickly, which will make it easy to move to a new place. Installation of plates is carried out without the use of special tools and materials. To install the floor does not require any special technical knowledge or special skills, which means that the floor can be installed and removed in a short time.

The main criteria by which OSTA floors were chosen:

- strength

- durability of operation

- simplicity of laying

- resistance to chemical reagents and temperature fluctuations

- does not require special surface preparation before installation

- aesthetics